Nguyen Thanh Tuan
- Trang chủ
- /
- Nguyen Thanh Tuan

Nguyen Thanh Tuan
5.0/5
Đánh giá từ VMC Works
Hành trình nghề nghiệp
Kinh nghiệm
FPT CITY DA NANG JOINT STOCK CORPORATION - staff
01/12/2022 - 01/09/2024
Infrastructure Engineer (MEP)
Operation and maintenance of square lighting system, electricity and water equipment of FPT urban area; Responsible for managing and evaluating Vendors to carry out the maintaining & repairing jobs for utilities equipment follow contract; Troubleshooting and reporting/investigation of facility issues; Coordinate MEP work during install MEP in infrastructure works; Monitor shop drawing submission and issued shop drawing approved to contractor; Early warning additional MEP item when Architect proposal new concept.
HUYNDAI ENGINEERING & CONSTRUCTION CO.,TLD - staff
01/04/2022 - 01/12/2022
MEP Coordinator – Team leader
Coordinate MEP work during install MEP at site with Civil work; Early warning additional MEP item when Architect proposal new concept; Request the Meeting when the work delay after day work; Issue MCD during the work not smooth at site; Monitor shop drawing submission to PMU and issued shop drawing approved to subcontractor; Make record of status MEP work done; Review and study different between MEP construction drawing and ID drawing, Share information for co-worker, (MEP team and design architect team), issue RFI to client; Divide scope of work between MEP and ID work related to interior.
FQM CORPORATION - staff
01/03/2018 - 01/03/2022
MEP Team Leader
Site supervision works to ensure all works in order and best quality; Attend a meeting with client, design consultant, main contractor, MEP contractor to resolve MEP conflict to construction work; Resolve MEP changed by remove service room/plant room; Review schedule MEP plan with Civil work submitted by main contractor; Coordinate with Fishing Manager to monitor ID work at site; Hand over furniture equipment's relation with MEP equipment to Operation unit (Rosewood).
HOA BINH GREEN (work for client) - staff
01/01/2017 - 01/03/2018
M&E Engineer
Weekly meeting with consultant and main contractor, MEP and ELV contractor; Coordinate MEP, EVL and Civil work at site; Push contractor make plan hand over floor by floor; Coordinate with Fishing Manager to monitor ID work at site; Hand over furniture equipment's relation with MEP equipment to Operation unit (ASCOTT INTERNATIONAL MANAGEMENT).
SAIGON TECHNOLOGIES, INC. - staff
01/01/2016 - 01/12/2016
M&E Engineer
Inspection and hand over the drainage system for the Client; Estimate, separate and request materials for construction; Make plan for installation of the cable tray system to meet the progress; Make plan for installation of the lighting and feeder cable system to meet the schedule; Implementing health, safety and environmental policies and procedures that meet the health and safety of the environment.
PETRO VIET NAM ENGINEERING JOINT STOCK COMPANY - staff
01/03/2015 - 01/12/2015
Site Manager
Make method statement and schedule pulling HV cable for all Sub-stations; Make materials request and equipment's for construction works; Responsible for coordinating, checking electrical and mechanical design drawings of designer consultant related to construction drawings and report mistakes to PM; To enforce Health, Safety and Environment policies and procedures for compliance with HSE systems and best practice communication to workforce.
FQM CORPORATION - staff
01/01/2014 - 01/01/2015
MEP Engineer
Required the contractor shall be submit documentation QA / QC of materials and equipment to shows that the installation is suitable design of the project and the contract signed; Responsible for coordinating, checking electrical and mechanical design drawings of designer consultant related to construction drawings and report mistakes to PM; All electrical equipment on site to be used in a safe and approved.
CDM SMITH, ADPI AND ADCC CONSORTIUM - staff
01/01/2010 - 01/12/2013
MEP Engineer
Request the Contractor shall be submit QA/QC documents showing that the installation are in accordance with Specification and Design as required by Vietnamese Construction Regulation; Responsible for coordinating and checking of MEP all shop drawings; Supervise works of contractor, monitor the quality and workmanship during construction; Write reports for the Team Leader and Project Manager to assess the overall progress; Make a schedule of all current non-conformance notifications initiated by the Main Contractor, the defect on the Works, the party responsible, any corrective action proposed and the target date for correction.
COMIN VIETNAM CO,. LTD (COMIN ASIA GROUP) - staff
01/11/2008 - 01/10/2010
M&E Engineer
Receive and divide MEP system to other staffs directly; Coordination other departments to archive the final MEP system; Prepare shop drawing and Submitted for consultant prior to implementation; Coordinating with mechanical/electrical activities for project smoothly running; Inspect project site to monitor progress and ensure conformance to design specifications, environmental, safety and health standards; Monitor works to ensure that contractor constructs project according to specifications, to maintain diary of work completed, and to prepare cost estimates and submissions for payment.
TRUONG GIANG ELECTRIC CO,. LTD - staff
01/06/2006 - 01/10/2008
Project Manager
Have a sense of responsibility in Project with general vision; Have experience in working for International Company, be responsible for submitting shop drawing before commencing work; Experience in leadership construction team (20 workers, 2 engineers) at site; Required workers and engineers to comply with work safety of project; Planning, executing, and controlling electrical activities of projects assigned.
THUAN HIEN PRODUCTION & TRADING SERVICE CO., LTD - staff
01/05/2002 - 01/06/2004
Production Manager
Supervising installation painting systems; Production machines woodworking, production report, production schedule (main item: mechanical); Working direct Client’s representative to handover machines and make commissioning check-list; Experience in leadership construction team at site; Make a preventive maintenance plan based on manufacturers’ instructions; Required workers and engineers to comply with work safety of projects. Chemical management, Protect worker health and safety; Set up the maintenance plan for all equipment and machine (preventive maintenance); Record all information related to preventive maintenance and repairs.
Bằng cấp
bachelor-degree
Engineer
2002
Electrification and Power supply
bachelor-degree
Engineer
2019
Civil Engineering